Our Facilities
Built for precision. Designed to scale. Our fabrication facilities support complex energy projects.
- Shop 1
Fabrication & Spooling Facility
This facility serves as ARJAE’s precision fabrication and specialty manufacturing hub. Designed for controlled production environments, Shop 1 supports detailed component fabrication, pipe spooling, and specialty system builds where quality control, material segregation, and process discipline are critical. Its layout and equipment enable efficient workflow for smaller modular systems, specialty assemblies, and custom-built components.
- Shop Stats
55,000 SF fabrication shop
10,000 SF office
2 fabrication bays
Crane capacity: 5–15 tonnes
20’ hook height
5-acre yard
Stainless steel segregation
2 Sub-Arc Welding Machines
- Key Duties Performed
Pipe spooling fabrication
Specialty system fabrication
Stainless steel processing and segregation
Component manufacturing and assembly
Sub-arc welding operations
Quality-controlled fabrication workflows
Pre-assembly and modular preparation
Material staging and logistics coordination
- Shop 2
Shop 2 is ARJAE’s heavy industrial fabrication and large-module production facility. Built to support high-capacity lifting, large assemblies, and complex modular systems, this shop enables the fabrication and integration of large-scale processing equipment and infrastructure components. Its heavy-lift capacity and expansive yard space allow for large project staging, modular integration, and heavy industrial assembly operations.
- Key Duties Performed
Heavy industrial fabrication
Large-module assembly
Skid fabrication and integration
High-capacity lifting operations
Structural fabrication
Modular system integration
Large equipment assembly
Heavy project staging and logistics
Industrial-scale welding operations
- Shop Stats
63,000 SF fabrication shop
8,400 SF office
4 fabrication bays
Crane capacity: up to 200 tonnes
42’ hook height
7-acre yard
Stainless steel segregation
2 Sub-Arc Welding Machines
- Calgary office
More information is Coming Soon

Strategic Locations Supporting Project Delivery
ARJAE’s facilities are positioned within major industrial corridors to support efficient logistics, transportation, and project execution.
Our operations benefit from:
- Proximity to major highway corridors (QE2 / Highway 2)
- Access to high-traffic industrial routes
- Rail access connectivity
- Airport proximity for rapid travel and logistics
- Location within the Nisku heavy-haul corridor
With Shop 1 and Shop 2 operating in close proximity, ARJAE maintains seamless material flow, coordinated scheduling, and parallel fabrication capability — enabling faster execution, reduced transportation complexity, and efficient large-project staging.
This strategic positioning allows ARJAE to support complex projects with controlled logistics, reliable access, and scalable delivery capacity.